FOSHAN GRK COMMERCIAL CO LTD

 Welcome to fsgrk,Flooring Solutions Service 
Go
WhatsApp/Wechat 0086 13660776067
Product detail

Heavy Duty Epoxy paint floor

 
Structure for Heavy Duty Epoxy paint floor
--Polish the sub-base
--Primer
--Strength layer
--Sanding again
--Putty layer
--Top coat
comment:0
Detail

Heavy Duty Epoxy paint flooring


Product Description

Heavy Duty epoxy floor can withstand the rolling of various vehicles (cars, forklifts, carts, etc.), and has certain mechanical properties and aesthetic requirements. parking lot etc.



Appearance

Group A is colored liquid, Group B is colorless liquid,



Features

Two-component material, used together.

Seamless dust-proof, pressure-resistant, impact-resistant

Good wear resistance and long service life

Resistant to general chemical corrosion



Product ratio

Primer is 1:1

Middle layer is 4:1

Top coat is 4:1



Scope of Application

Factory, warehouse, underground parking lot, industrial land and other heavy-duty ground



Construction Amount

Primer 0.15kg/sqm, Middle layer 0.4kg /sqm ,Top coat 0.2 kg/sqm.



Ground Requirements before Construction

Flat, high ground strength



Finished Surface

After correct construction and curing, it can achieve smooth and smooth effect, uniform color, no construction marks, no bubbles, no shrinkage holes, no impurities, etc. However, some defects caused by improper operation and other subjective and objective reasons are not excluded.



Precautions

1. This product is a chemical product and requires professional construction workers to use it. Do not add diluents or fillers at will during construction. When using, please determine the amount of each ingredient according to the construction progress and ambient temperature. The prepared materials must be used up at one time, and the unprepared materials must be sealed at any time.

2. The suitable construction temperature range of this material is 5-40℃.

3. If the ambient temperature during construction is low, the mixing viscosity of the product will decrease accordingly, and the operating time can be extended. If the ambient temperature is high during construction, the mixing viscosity of the product will increase accordingly, and the operating time will be shortened.

4. Before using this material, please read this product manual carefully, and you can contact us at any time before and after construction, so that this product can achieve the best effect.



Safety Precautions

This product is a chemical that is harmful or fatal if swallowed, seek medical advice immediately if swallowed. In case of accidental contact with eyes, rinse with plenty of water. In severe cases, seek medical attention immediately. Pay attention to precautionary measures, fire and explosion protection, and the disposal of residues should comply with relevant national or local government safety regulations.



Storage

Store at room temperature of 10°C-30°C, humidity 50%-80%; all materials are placed in a fixed position and marked in this area to avoid confusion. The warehouse is well ventilated and the temperature is at room temperature. Open paint and leaking materials are stored separately and marked.



Product Packaging

Primer Group A 18kg,Group B 18kg,

Middle layer Group A 24kg,Group B 6kg,

Topcoat Group A 24 kg, Group B 6 kg.



Process Diagram

Heavy Duty Epoxy Paint



Contact Us

Name: Madam Wendy

Mob:0086-13660776067 (WhatasApp,Wechat)

Facebook: paintfloor.GRK

Email:grk-sales@foshangrk.com.cn


FOSHAN GRK COMMERCIAL CO LTD

Email:grk-sales@foshangrk.com.cn Contact: +86 13660776067