FOSHAN GRK COMMERCIAL CO LTD

 Welcome to fsgrk,Flooring Solutions Service 
Go
WhatsApp/Wechat 0086 13660776067
Product detail

Light Duty Epoxy paint flooring

 
Sturcture for Light Duty Epoxy paint flooring
--Polish the subbase
--Primer
--Putty layer
--Top coat
comment:0
Detail

Light Duty Epoxy paint flooring


Product Description

Modern factories have very high requirements on floors. Generally, bright and clean floors are required, but there is a lack of funds. For non-heavy-loaded areas, epoxy flat coating can be selected. It consists of primer, middle layer and top coat, and is mainly used for new cement floors with smooth ground and high ground strength.



Appearance

Group A is colored liquid, Group B is colorless liquid,



Features

Two-component material, used together.

The construction is convenient and the price is cheap.

After completion, it can achieve a smooth and smooth effect.



Product ratio

Primer is 1:1

Middle layer is 4:1

Top coat is 4:1



Scope of Application

Non-heavy-loaded grounds such as workshops, offices, warehouses, food factories, etc.


Construction Amount

Primer 0.15kg/sqm, Middle layer 0.1kg /sqm ,Top coat 0.2 kg/sqm.



Ground Requirements before Construction

Flat, high ground strength



Finished Surface

After correct construction and curing, it can achieve smooth and smooth effect, uniform color, no construction marks, no bubbles, no shrinkage holes, no impurities, etc. However, some defects caused by improper operation and other subjective and objective reasons are not excluded.



Precautions

1. This product is a chemical product and requires professional construction workers to use it. Do not add diluents or fillers at will during construction. When using, please determine the amount of each ingredient according to the construction progress and ambient temperature. The prepared materials must be used up at one time, and the unprepared materials must be sealed at any time.

2. The suitable construction temperature range of this material is 5-40℃.

3. If the ambient temperature during construction is low, the mixing viscosity of the product will decrease accordingly, and the operating time can be extended. If the ambient temperature is high during construction, the mixing viscosity of the product will increase accordingly, and the operating time will be shortened.

4. Before using this material, please read this product manual carefully, and you can contact us at any time before and after construction, so that this product can achieve the best effect.



Safety Precautions

This product is a chemical that is harmful or fatal if swallowed, seek medical advice immediately if swallowed. In case of accidental contact with eyes, rinse with plenty of water. In severe cases, seek medical attention immediately. Pay attention to precautionary measures, fire and explosion protection, and the disposal of residues should comply with relevant national or local government safety regulations.



Storage

Store at room temperature of 10°C-30°C, humidity 50%-80%; all materials are placed in a fixed position and marked in this area to avoid confusion. The warehouse is well ventilated and the temperature is at room temperature. Open paint and leaking materials are stored separately and marked.



Product Packaging

Primer Group A 18kg,Group B 18kg,

Middle layer Group A 24kg,Group B 6kg,

Topcoat Group A 24 kg, Group B 6 kg.



Process Diagram

平涂-英.jpg

FOSHAN GRK COMMERCIAL CO LTD

Email:grk-sales@foshangrk.com.cn Contact: +86 13660776067