Quick Details
Place of Origin: Guangdong, China (Mainland) Brand Name: GRK
Model Number: RT-012TR Sport: tartan track, running track, jogging track
Colors: Customized Certificate: ISO
Thickness: 13mm Foundation: Asphalt/ Concrete
Weather condition: all weather condition Environmental condition: no contain of heavy metal
SupplyAbility
SupplyAbility: 100 tons per Day
Packaging and Delivery
Packaging Details: barrels with wood pallet
Port: Guangzhou/Shenzhen port
Lead Time : Shipped in 4 days after payment
General
Spray coat system tracks/ Permeable surface/ Porous Tracks
The most common synthetic track surface is a spray coat system. Spray coat systems provide a cost effective solution to facility providers who wants to install a track facility for training and low level local competitions and the softer surface characteristics of porous surfaces make it an ideal solution for schools and community athletics clubs.
The system is made up of two layers: a sub base made up of black rubber granules bound with polyurethane binder, and a spray finish of coloured EPDM (rubber) granules and pigmented polyurethane.
The most common synthetic track surface is a spray coat system. Spray coat systems provide a cost effective solution to facility providers who wants to install a track facility for training and low level local competitions and the softer surface characteristics of porous surfaces make it an ideal solution for schools and community athletics clubs.
The system is made up of two layers: a sub base made up of black rubber granules bound with polyurethane binder, and a spray finish of coloured EPDM (rubber) granules and pigmented polyurethane.
Key Advantages
The most popular synthetic track system; ideal for schools and community tracks
Excellent energy reduction properties
Economical system providing a cost effective solution
Will take up to 50,000 athlete user hours per year
Professional clean every 3years
Re-mark every 7years
Surface respray after 7-10 years dependent on use. Note: May need minor repairs/resurfacing to areas of heavy wear during this period
Installation
- Base Requirements
Asphalt:
It is the responsibility of the asphalt-paving contractor to provide documentation that the paving meets those requirements set forth for asphalt paving. Additionally, the asphalt is to cure for a minimum of 28 days prior to synthetic surfacing being applied. Asphalt compaction tests are to be provided showing a compaction of 95% or greater. The asphalt will be checked with a 10 foot straight edge in all directions. Those areas not in conformance will be repaired and/or replaced by the paving contractor. Flooding the asphalt surface to locate irregularities is highly recommended.
Concrete:
All concrete work is to cure for a minimum of 45 days. No curing agents are to be used. Any concrete flat work such as run ups etc will be checked.
All areas to receive synthetic surfacing are to be clean and free of any loose particles or foreign substances such as dirt, oil, grease, etc.
Note
1) Before using the material ,please stir evenly.
2) Before installation, we should test a little dimethylbenzene, as the different production batch have different consistence.
3) Plan and control the usage for square meter.
4) The mixture shall pour into the mixing machine in turn. Group A first, Group B second, hardener and stir evenly, and put in the granule, powder, and dimethylbenzene.
5) Thoroughly clean ground before painting lines, and prevent flaws produced by isolating. Do not paint lines when there is a wind.
6) Ensure no rain within 4hours after construction.
Packing & Shipping
Cases Reference
Contact Us
Name: Ms Wendy (Jianli)
Mob:0086-13660776067 (WhatasApp,Wechat)
Facebook: paintfloor.GRK
Email:grk-wendy@foshangrk.com.cn