13mm Stadium Track

 
Spray coat track structure
--Seal Primer
--SBR layer
--Spray EPDM top coat
--Line marking
comment:0
Detail

Quick Details

  • Place of Origin: Guangdong, China (Mainland)                                   Brand Name: GRK                                           

  • Model Number: RT-012TR                                                                   Sport: tartan track, running track, jogging track                       

  • Colors: Customized                                                                             Certificate: ISO                                                                         

  • Thickness: 13mm                                                                                 Foundation: Asphalt/ Concrete

  • Weather condition: all weather condition                                             Environmental condition: no contain of heavy metal                 



SupplyAbility

SupplyAbility: 100 tons per Day



Packaging and Delivery

Packaging Details: barrels with wood pallet

Port: Guangzhou/Shenzhen port

Lead Time :   Shipped in 4 days after payment



General

Spray coat system tracks/ Permeable surface/ Porous Tracks

porous-track


The most common synthetic track surface is a spray coat system. Spray coat systems provide a cost effective solution to facility providers who wants to install a track facility for training and low level local competitions and the softer surface characteristics of porous surfaces make it an ideal solution for schools and community athletics clubs.

The system is made up of two layers: a sub base made up of black rubber granules bound with polyurethane binder, and a spray finish of coloured EPDM (rubber) granules and pigmented polyurethane.

The most common synthetic track surface is a spray coat system. Spray coat systems provide a cost effective solution to facility providers who wants to install a track facility for training and low level local competitions and the softer surface characteristics of porous surfaces make it an ideal solution for schools and community athletics clubs.

The system is made up of two layers: a sub base made up of black rubber granules bound with polyurethane binder, and a spray finish of coloured EPDM (rubber) granules and pigmented polyurethane.



Key Advantages

The most popular synthetic track system; ideal for schools and community tracks

Excellent energy reduction properties

Economical system providing a cost effective solution

Will take up to 50,000 athlete user hours per year

Professional clean every 3years

Re-mark every 7years

Surface respray after 7-10 years dependent on use. Note: May need minor repairs/resurfacing to areas of heavy wear during this period



Installation

athleitc track construction work

- Base Requirements

Asphalt:

It is the responsibility of the asphalt-paving contractor to provide documentation that the paving meets those requirements set forth for asphalt paving. Additionally, the asphalt is to cure for a minimum of 28 days prior to synthetic surfacing being applied. Asphalt compaction tests are to be provided showing a compaction of 95% or greater. The asphalt will be checked with a 10 foot straight edge in all directions. Those areas not in conformance will be repaired and/or replaced by the paving contractor. Flooding the asphalt surface to locate irregularities is highly recommended.


Concrete:

All concrete work is to cure for a minimum of 45 days. No curing agents are to be used. Any concrete flat work such as run ups etc will be checked.

All areas to receive synthetic surfacing are to be clean and free of any loose particles or foreign substances such as dirt, oil, grease, etc.


Note

1) Before using the material ,please stir evenly.

2) Before installation, we should test a little dimethylbenzene, as the different production batch have different consistence.

3) Plan and control the usage for square meter.

4) The mixture shall pour into the mixing machine in turn. Group A first, Group B second, hardener and stir evenly, and   put in the granule, powder, and dimethylbenzene.

5) Thoroughly clean ground before painting lines, and prevent flaws produced by isolating. Do not paint lines when there is a wind.

6) Ensure no rain within 4hours after construction.



Packing & Shipping

8lanes stadium track and field

pu binder

tartan track packing



Cases Reference

400meter stadium track

training center race field


Contact Us

Name: Ms Wendy (Jianli)

Mob:0086-13660776067 (WhatasApp,Wechat)

Facebook: paintfloor.GRK

Email:grk-wendy@foshangrk.com.cn


FOSHAN GRK COMMERCIAL CO LTD

Email:grk-sales@foshangrk.com.cn Contact: +86 13660776067