FOSHAN GRK COMMERCIAL CO LTD

 Welcome to fsgrk,Flooring Solutions Service 
Go
WhatsApp/Wechat 0086 13660776067
Product detail

SPU-buffer coat

 
Liquid rubber coating material is the key material of silicon PU material, which is composed of two-component PU material and material containing silicone composition.
comment:0
Detail

Liquid rubber coating material (SPU-003L)



Product Introduction

Liquid rubber coating material is the key material of silicon PU material, which is composed of two-component PU material and material containing silicone composition. Effectively solve the PU materials in the professional performance, environmental protection construction, life, routine maintenance and other aspects of the lack.

Product feature:

Self-leveling, have a good shock absorption and resilience, anti-skid, strong anti-fouling, one component moisture curing, construction is simple, simple maintenance, environmental performance.



Technical Data

Item

Data

Color

Light green color

Viscosity25℃Mpa·s

4000~10000

Solid content%

≥ 92

Applicable period(25℃min

≥ 40

Surface curing time25℃h

≤ 8

Full curing time25℃h

≤ 24

Hardness Shore A

40~50

Tensile strengthMPa

≥ 1.5

Elongation at break%

≥ 450

Compression recovery rate%

≥ 24



Application:

Tennis court, basketball court, badminton court, multipurpose court, playground



Composition:

Chemical Name

In % by Weight

CAS No. CAS

EC No. EC

Molecular Formula

polyurethane resin

32%

9009-54-5

210-898-8

C3H8N2O

DOTP

13%

6422-86-2

229-176-9

C24H38O4

Calcium carbonate

25%

471-34-1

207-439-9

CaCO3

Talc

15%

14807-96-6

238-877-9

Mg3[Si4O10](OH)2

iron oxide

10%

1332-37-2

215-570-8


Urea formaldehyde

5%

9011-05-6

---

C2H6N2O2



Packaging and Storage

Packing: 30kg/ drum

Upside down stored.

Stored in a cool, ventilated and dry warehouse, keep away from fire and heat sources, and keep waterproof, damp proof and light proof.

Storage period: six months from the date of production. More than the storage period, the test can continue to use.



Installation

1) At least apply 2layers or 2.7mm

2) Usage: (1layer use 0.7—1mm/)

0.7mm/ usage is 1.2-1.3kg

1mm/ usage is 1.4-1.5kg

3) 30kg liquid rubber coating material mix with 0.91.2kg PU resin and 100-180gram water, applied by rubber squeegee

4) After 1 layer, it should maintain about 10-12 hours, ensure the firstly layer are dry, then the next process.

5When install the firstly layer on concrete base ,we suggest 30kg liquid rubber coat material mix with 180gram silica sand .(It is better to seal the sub-base moistures)


FOSHAN GRK COMMERCIAL CO LTD

Email:grk-sales@foshangrk.com.cn Contact: +86 13660776067