Company name : Foshan GRK Commercial CO LTD
Address: No.5-1 YongxingXiang Yanjiang Road Gaoming district Foshan China 528500
Website: www.fsgrk.com
Tel./WhatsApp: +86 13660776067 or +86 13726309092
Email: grk-sales@foshangrk.com.cn
Country of Original: China
Province /State: Guangdong
City: Foshan City
Structure for Anti-static Epoxy coating
--Polish the sub-base
--Primer
--Strength layer (optional)
--Sanding the floor(optional)
--Putty layer(optional )
--Paste copper foil
--Carbon black layer
--Anti-static top coat
Product Description
In the manufacturing industry, electric sparks caused by electrostatic accumulation are prone to production accidents. On this basis, there is an anti-static floor. In addition to the performance of general epoxy mortar, it can effectively prevent the accumulation of static electricity. It can release the accumulated static electricity brought by foreign objects through conduction dissipation. It is an ideal floor system for various electronic enterprise workshops, computer manufacturing workshops and explosion-proof workshops of chemical enterprises.
Appearance
Group A is colored liquid, Group B is colorless liquid,
Features
Can quickly leak electrostatic charge
Long-lasting anti-static effect
Not affected by time, temperature and humidity
Environmentally friendly, pollution-free, non-toxic
Product ratio
Primer is 1:1
Middle layer is 4:1
Self-leveling Top coat is 4:1
Scope of Application
Chemicals, powders, computer rooms, control centers, oil storage tanks and other floors that need anti-static
Construction Amount
Primer 0.15kg/sqm, Middle layer 0.15kg /sqm ,Top coat 0.7 kg/sqm.
Ground Requirements before Construction
Flat, high ground strength
Finished Surface
After correct construction and curing, it can achieve smooth and smooth effect, uniform color, no construction marks, no bubbles, no shrinkage holes, no impurities, etc. However, some defects caused by improper operation and other subjective and objective reasons are not excluded.
Precautions
Safety Precautions
This product is a chemical that is harmful or fatal if swallowed, seek medical advice immediately if swallowed. In case of accidental contact with eyes, rinse with plenty of water. In severe cases, seek medical attention immediately. Pay attention to precautionary measures, fire and explosion protection, and the disposal of residues should comply with relevant national or local government safety regulations.
Storage
Store at room temperature of 10°C-30°C, humidity 50%-80%; all materials are placed in a fixed position and marked in this area to avoid confusion. The warehouse is well ventilated and the temperature is at room temperature. Open paint and leaking materials are stored separately and marked.
Product Packaging
Primer Group A 18kg,Group B 18kg,
Middle layer Group A 20kg,Group B5kg,
Top coat Group A 20 kg, Group B 5 kg.
Process Diagram